U
User482
Guest
What I did:
1. Fill insulation to the depth of the exiting joists.
2. Screw lengths of 4x2 at right angles to existing joists.
3. Fill insulation to depth of new timbers.
4. Fit loft boards across the top and screw down.
You have a good depth of insulation, and the load is well supported. Make sure any wiring is not buried at the bottom of the insulation. A mask, gloves, goggles and overalls/ paper suit are essential for this job.
1. Fill insulation to the depth of the exiting joists.
2. Screw lengths of 4x2 at right angles to existing joists.
3. Fill insulation to depth of new timbers.
4. Fit loft boards across the top and screw down.
You have a good depth of insulation, and the load is well supported. Make sure any wiring is not buried at the bottom of the insulation. A mask, gloves, goggles and overalls/ paper suit are essential for this job.