Hicky
Guru
I’m after some advice. I’ve a rough idea what I’m doing however I’d like a bit of direction.
I’m looking at flagging/paving half my yard and concreting the remainder for a kennel to sit on.
I’ve had a guy in to quote however I suspect he thought it would be a bigger job so I’m expecting him to quote himself out of it.
If that happens I’ll consider doing it myself.
My idea was remove the existing ropey tarmac and lowering the ground level appropriately and separating the two spaces. Mot the whole thing and compact. For the concreted area I’m looking at a depth of 100mm...keeping 150 below DPC.
The paved area , sharp sand or a dry mix as the base(tamp down), boxing off drains to be mortared in later. Lay the final surface and brush in the remaining dry mix for pointing and compact.
Does this sound sensible , all advice appreciated. It’s a 2up2down size yard.
I’m looking at flagging/paving half my yard and concreting the remainder for a kennel to sit on.
I’ve had a guy in to quote however I suspect he thought it would be a bigger job so I’m expecting him to quote himself out of it.
If that happens I’ll consider doing it myself.
My idea was remove the existing ropey tarmac and lowering the ground level appropriately and separating the two spaces. Mot the whole thing and compact. For the concreted area I’m looking at a depth of 100mm...keeping 150 below DPC.
The paved area , sharp sand or a dry mix as the base(tamp down), boxing off drains to be mortared in later. Lay the final surface and brush in the remaining dry mix for pointing and compact.
Does this sound sensible , all advice appreciated. It’s a 2up2down size yard.