Steam Pig
Well-Known Member
- Location
- Queensbury, usually in thick fog
When I ordered my disc trucker in early July, which will be built to my spec, I was told due to the size I wanted the frame was not in stock and would have to be ordered in. I thought OK a couple of weeks maybe? After a couple of weeks I rang the shop and was told, there were no frames of the size I wanted in the country and would have to wait for the next shipment from the States, Ok, I'd missed using the bike for my summer hols by now so I said I'd wait.
Now after phoning the bike shop again, the frame is now due end of October and is no longer maroon but blue
http://surlybikes.com/bikes/disc_trucker
Bear in mind when ordered the bike I specced it with maroon frame, chromo mudguards, chromo rack, basically the colour scheme was maroon and silver. It is now going to be blue and silver, and I'm not sure about the end result, would it look better with black accessories?
Now after phoning the bike shop again, the frame is now due end of October and is no longer maroon but blue
http://surlybikes.com/bikes/disc_trucker
Bear in mind when ordered the bike I specced it with maroon frame, chromo mudguards, chromo rack, basically the colour scheme was maroon and silver. It is now going to be blue and silver, and I'm not sure about the end result, would it look better with black accessories?