punkypossum
Donut Devil
- Location
- My own little planet...
Just wondering what the legal situation in the UK is. In Germany for example, if you get a quote for some work to be carried out, the final bill is not allowed to be more than a maximum of 15-20% higher than the quote. Does the same apply in the UK?