Tea?

Page may contain affiliate links. Please see terms for details.

classic33

Leg End Member
No, there is quite a lot of digging. I dig a section, then do the pipework in that bit, and there is quite a lot of mucking around with levels and so on (this is surface water drainage from the sunken patio, and levels are absolutely critical). So, that's lot's of words for "I haven't finished, and will be digging tomorrow".

Hey, was it you who nipped down here and let the air out of my rear tyre whilst I was away? I left it in perfect order, 100+ psi, and came back to find it flat as a pancake. That's not fair!!
T'wantmissen!!

You'd be a bit slow on a building site though.
Haven't been to Abertawe for a long while now.... :sun:
And now we'll be getting a summer. Can't be connected can they?
 
Last edited:
OP
OP
172traindriver

172traindriver

Legendary Member
Long day?

And there was me, trying to work out who'd been bad.

Yes Mr Classic 02:30 get up for 04:00 start.
At least its a lie in till 06:00 get up in the morning
 
Top Bottom