Kingfisher101
Veteran
I'm needing my sub floor reboarding as the ply has seperated from the floorboards( old floor 1960). So the local flooring place recommeded their joiner who looked at the job then gave a quote etc. All good. He never got back in touch despite me sending a message so the shop had to get back in touch with him and after a wait he gave me a date the 27th Feb. So by last week he hadnt said what time he was coming etc so I rang and asked and he said he wasnt coming now and that he would send someone else instead to do the job!!. I initially said yes but then sent him a text cancelling as I've had work botched in my house before and dont want it happening again. Plus I need to check that the person is a proper joiner etc and is able to do the job. I dont want someone starting a job then walking off it because they cant do it etc. The arrangement was that the original joiner would do the work full stop.
The flooring place were not very pleased as they were coming in the fit the flooring etc the next day. I said that I would get another joiner to do the floor who I have chosen then they could come and fit the flooring.
Would you have just let the mate of the joiner come and take the floor up/reboard when you hadnt even met them and establish if they could do it o.k? Just on the say so of the joiner who has been a total flake?
The flooring place were not very pleased as they were coming in the fit the flooring etc the next day. I said that I would get another joiner to do the floor who I have chosen then they could come and fit the flooring.
Would you have just let the mate of the joiner come and take the floor up/reboard when you hadnt even met them and establish if they could do it o.k? Just on the say so of the joiner who has been a total flake?
Last edited: