So you were lopsided carrying them up the steps or you have one arm stronger than the other...................One bucket was a substantial heavy gardening sort of bucket, the other bucket was smaller, red and lighter.
So you were lopsided carrying them up the steps or you have one arm stronger than the other...................One bucket was a substantial heavy gardening sort of bucket, the other bucket was smaller, red and lighter.
I think her wife is hiding in Fabian's closet!When I met Speicher, she didn't mention a wife...
When I met Speicher, she didn't mention a wife...
Along with my husband ...I think her wife is hiding in Fabian's closet!![]()
So you were lopsided carrying them up the steps or you have one arm stronger than the other...................
I would like to make the flower borders in my garden narrower than they are now. The lady who lives opposite me has employed a landscape gardener to dig up her garden, and put in a large patio. She very kindly agreed to let me have the top soil and turf from her garden. Are you with me so far?
The gardener's wheelbarrow is very large, with a bucket say about 30" long, 15" deep and 20" wide. He tipped about twelve barrows' full of soil/turf on the end of my garden. The turf and topsoil are needed in the back garden, and there are twelve steps all approximately 8" high.
Using two fairly equally loaded buckets, how much surf/topsoil in total did I carry up the steps?Unfortunately I did not count the number of times I walked up the steps carrying topsoil.
None. You don't need more topsoil to make your flower borders narrower.
Well I reckon you just turfed the lot up the steps as hard as you could throw. No need to walk at all.
First pun to me
![]()
None carried UP the steps, it was all carried down?
When was the last time you did any gardening?
The level of the soil in the flower and shrub borders is about 3 inches below that of the lawn. Topsoil is needed to bring any new turf to the level of the existing lawn. Some of the turf that I carted up the steps has been placed where it is needed, but the edges of the borders have not been properly prepared.
2 tons
Before you dig it out it's about 1.8t per cubic metre. Some more sums are needed.