Anybody fancy a pint..

Page may contain affiliate links. Please see terms for details.
OP
OP
keithmac

keithmac

Guru
It started off as "just slap a few tiles on", but will be nice when it's finished.

Bathroom and Kitchen were a nightmare so I suppost I shouldn't have expected an easy time of it!.

Most annoying thing was the floor, just can't understand why they'd leave it like that and think it was ok..

And the toilet, a bit of thought with the design and it could have been built and fitted 1st time without any messing about.
 

postman

Legendary Member
Location
,Leeds
20170520_192013-jpg.jpg
That must have been one hell of a Curry.
 
OP
OP
keithmac

keithmac

Guru
Came across some interesting wiring when fitting my new LED light, electrical screwdriver came to the rescue to find which black was switched live (very odd..). Had to remove old ceiling rose.

2hr+ battle with the lino and all fitted and siliconed round the edges, never again!.

Doors back on and it's finally finished!.

20170604_163446.jpg
20170605_182542.jpg
 
OP
OP
keithmac

keithmac

Guru
I spent a few hours making a neat removable solution to boxing in the waste pipe. Even cut some fake grout lines into it and grouted to make it more pleasing to the eye.

Wife's covered up all my had work!.

20170611_143153.jpg
 
Top Bottom