The 1.5m strip that wobbles into 2m (in parts) through Tooting does not address the 15 or so side roads on the Tooting Bec to Broadway section - these present a real problem to cyclists as it's right/left hooks a go go.
The blue paint at major junctions (far left) puts cyclists in a poor position. More positvely, I have noticed some drivers observing the CS markings and giving cyclists room - however, it's very hit and miss (pun intended).