East London Cyclists - Ruckholt Road Bridge?

Page may contain affiliate links. Please see terms for details.

subaqua

What’s the point
Location
Leytonstone
That's quite a detour to avoid the roundabout (looking at the map) - like I mentioned above, there is the slight variation using Hackney Wick station/Wick Lane/Fairfield St from the Eastway to Bow Church - IIRC, it's only 1 set of traffic lights from Bow Church to the Eastway, which makes things quick.

Agree about the Eastway and Ruckholt spell - took me by surprise when I started riding again this week and found there to be no streetlights on that stretch of the Eastway - especially given you're supposed to go against the flow in the cycle lane. (I had hoped it would have been resurfaced nicely too, and it's not) Surprised the Ruckholt Road bridge is taking so long - trying to find info on the internet about when it will finally be done, late April/Early May is being listed here, with another 2 weeks of traffic chaos with a roadworks on the existing bridge:

http://www.walthamforest.gov.uk/index/transport/road-highway/road-works.htm

Couldn't they have brought the bridge in a little later....?

bridge has been in on site prep and has been completed earlier than programme according to one of the balfour guys i know on site. the brick piers to support it ahve been a bit of a nightmare too.

the defective lights have been logged as a job too . handy working on the park sometimes
 
Top Bottom