mgarl10024
Über Member
- Location
- Bristol
Hi all,
On my commute, I mainly stick to the provided shared use paths, however have found that they can get very congested with school children around school times. Whilst this is an irritation to me (it slows me down) I was more concerned about there being an accident, so I emailed Sustrans/BetterByBike and got some good responses which I thought might be of interest to people on here.
Sent to Sustrans and BetterByBike
Response From BetterByBike:
Response From Sustrans:
Response From South Glos Council:
I'll update you as I get any further responses - comments welcome.
Thanks,
MG
On my commute, I mainly stick to the provided shared use paths, however have found that they can get very congested with school children around school times. Whilst this is an irritation to me (it slows me down) I was more concerned about there being an accident, so I emailed Sustrans/BetterByBike and got some good responses which I thought might be of interest to people on here.
Sent to Sustrans and BetterByBike
Firstly, I’d just like to take the time to thank you for all that you have done for cycling in Bristol. I’m a comparatively new cyclist (having stopped cycling around my early teens), and this year have taken it back up again and am now commuting almost daily. :-)
I’m writing with respect to Bradley Stoke Way in Bristol. This road is a shared cyclist/pedestrian path (it’s quite wide), and is featured on both BetterByBike’s/South Glous Council’s and Sustran’s cycling maps. I’ve included a map below to point out the particular bit in question – running between Bailey’s Court Road and the new Tesco complex.
http://maps.google.c...038581&t=h&z=15
The issue I have with this particular section is that during my commute (approx 730-8am) the pavement is heavily used by school children walking to school. This is actually a very good thing (much better than them all being driven to school), but unfortunately they straddle the pavement 4 abreast and prevent anything getting through. Last week, I passed around 50 children in wide groups of 4 on that stretch alone, and whilst all of the children have been very respectful and move out of the way when a bell is sounded, it can be a little frustrating as it means slowing right down (which on a bit of a hilly climb is very unwelcome!). ;-)
However, of more concern, is the potential of an accident and that one of them may be hurt. I consider myself to be quite a slow cyclist – virtually every other cyclist overtakes me – but in the last week I’ve had:
- A child walking towards me, head down. I completely stopped and it wasn’t until he was about 1m from my handlebars that he looked up, saw me for the first time and gasped.
- A child walking towards me, head down, focused on a phone. Same as above – unaware until 1m away and I was completely stopped.
- A child randomly changing direction and walking out in front of me, causing me to brake.
- A child on a bike, cycling at walking pace with his friends, pulling out in front of me, causing me to brake.
- Etc.
With so many near misses, and noting that most other cyclists travel at greater speed than myself, I don’t think it will be long before there’s an accident.
It got me thinking what could be done, and I thought that perhaps
- I could start using the road – however it is such a fast road that I wouldn’t feel safe.
- The pavement could be painted like a cycle track – a white line down the middle, with bikes on one side, pedestrians on the other. It wont solve the problem, but may remind the children that they aren’t the only people using the path (and conversely it may remind very fast cyclists that the path isn’t just for them). This is also a very cheap solution.
- Extra signage could be installed, showing both pedestrians and bikes, again reminding the children.
- The local schools could be contacted to remind the children of other path users and the dangers of being oblivious to them.
I hope that this feedback is helpful and that it is taken in the spirit it is meant. Whilst being slowed down on a morning is a minor inconvenience, I’m writing more out of concern of a future accident. I welcome comments on the above, and have also emailed BetterByBike for their input.
Thanks in advance,
Response From BetterByBike:
Many thanks for your email. I'm very grateful that you've taken the time to write to us and highlight the problems you've identified. Often it's not until we're alerted to problems that we can do something about them. Thanks too for the solutions - you probably know this route better than we do (as you use it regularly) so it's handy to hear first-hand what improvements you would welcome.
I will pass your email on to my colleagues at South Gloucestershire council (at cycleforum@southglos.gov.uk) to consider what measures can be taken to improve the situation.
Kind regards
Response From Sustrans:
Thank you for your email. The link was installed by South Glos so I have asked them to have a look at different options following your comments. I will let you know any response that I get back. The shared use situation is a difficult one because studies in places such as the Netherlands have shown that this model works best and helps breed a culture of shared, valued space. However, it takes a while to move over to this way of thinking, plus younger people are not always quite so aware of the dangers they may face. I think a good starting point would be for the schools and parents to remind the children to be aware.
Kind regards
Response From South Glos Council:
I refer to your e-mail sent to Sustrans on 19th September concerning Bradley Stoke Way, (below), which has been forwarded to me for a response.
It would be interesting to know more details of your daily commute, as there may be an alternative route you could try, (although this does nothing to resolve your concerns about Bradley Stoke Way)!
You may be interested in Cycling City Route 3, (Parkway Station to Bradley Stoke) – details attached – which extends to Savages Wood Road roundabout / Bradley Stoke Leisure Centre. The off-carriageway sections of this route, (also alongside Bradley Stoke Way), are 3m wide with cycle symbols and shared use signing, (un-segregated). The route you indicate you on the west side of Bradley Stoke Way is too narrow to segregate users – for this a minimum total width of 4m is recommended – although there are very few shared use signs and no cycle symbols on the path.
There are some busier locations below 4m wide where segregating cyclists from pedestrians using a white line is advisable - such as certain sections of the A4174 ring road cycle path, (typically 3m wide). The wider section of path alongside Bradley Stoke Way, north west of the Brook Way roundabout, is also already segregated. However, if the path is less than 3m wide, (as it is to the south east of Brook Way), segregation is not normally a realistic option.
I think the vast majority of school children in the Bradley Stoke area are already aware that the paths are shared use - cycling levels amongst school children in Bradley Stoke are very high. I also think that school children, (in groups), would probably not be particularly likely to observe or comply with the markings / signing, if a segregation line was installed (!) In the long run, widening of the path could be the answer, (although there are plenty of cyclists who would still prefer to remain on the main carriageway).
In the meantime, although it would be possible to introduce one or two carefully sited cycle symbols on the path, on paths less than 3m wide this can falsely create an impression that cyclists have some kind of priority over other users. Alternatively, some additional shared use signs could be erected, mainly on existing lamp columns, to remind users that the path is available to pedestrians and cyclists alike. This sign, (Diag 956 in the Traffic Signs Regulations), is in very common use and is well recognised / understood. To do this, it would be appropriate to consider the entire length of Bradley Stoke Way - to ensure the signing and lining is consistent along its length. I will look into this to find out where any additional shared used signs are most needed.
Regards,
I'll update you as I get any further responses - comments welcome.
Thanks,
MG