4.7 & I'm surprised at that, it's been bleak here today
We have a SolarEdge system comprising 14 x 395Wp panels on a south facing roof, a 9.7kwh battery, and a combined inverter/EV charger. Quote was for £14.5k for slightly lower rated panels and no ev charger but the supply chain dictated either changes or a much longer wait. Quote included scaffolding. We have the battery and inverter on the side of the house so there's a bit less space on the drive, and cabling on the wall too. The panels went up in a day, the electrics took a bit longer but it was surprisingly low stress compared to all the delays with supply.
Batteries on the outside of the house? I'd prefer that option as that wouldn't clog up my garage.
Batteries on the outside of the house? I'd prefer that option as that wouldn't clog up my garage.
This may be a stupid question, but how will i know how much im exporting back to the grid???
I am having a new Smets2 smart meter being fitted on wednesday
Whatever app you are using to monitor your production & usage should also show export.
You should also be able to cycle through options on the meter display to show export values.
It is a Growatt that you have?
Do you not have something like
View attachment 666550
But you need CT clamps for the inverter to understand whats being sent where, but like all these things Octopus I suspect will only pay what the meter tells them. Just to add the reason mine shows nothing coming from the PV panels is I'm missing a CT clamp on that feed
Speak to your installer pretty sure you should have one on at least the inbound feed, you may not need one on your PV generation as that goes straight into your Inverter, mine doesn't as I have a separate inverter for the PV to the batteries.yeh i dont have any ct clamps on my system at all