Morning all, The saga of the bathroom continues. All the units/cistern/panals have been stacked up in the back room for three weeks, the tiles are being delivered today, the builder is now replacing the down pipe from the bath as a piece of masonry is blocking the pipe, a bit must of gone down the pipe when the plumber put the bath in place. The side way was flooded Saturday morning as the bathwater overflowed. The builder is waiting for delivery of the new windows, (hopefully today) so he can put those in and then start plastering the room. It's all getting a bit muddled.