Teuchter
Über Member
- Location
- Erskine, Scotland
My route takes me over the Squinty Bridge (officially it's called the "Finnieston Bridge" but this is Glasgow) here: http://goo.gl/maps/1Kb69
I cross the bridge then go right onto the Broomielaw / Lancefield Quay, staying on the road the whole time. I make use of the ASL in the above link and most of the time wait go through on the green light with the rest of the traffic but occasionally timing means I arrive at and go through the junction when the green man / bicycle is lit.
Now it's a toucan crossing (green man for pedestrians alongside a green bicycle for... bicycles!) and when I do this, I wait until all pedestrians have cleared the junction before slowly proceeding, not building up speed until I'm away from the crossing. My concern is that as I at no point use the cycle track, am I in the wrong to cross then?
I cross the bridge then go right onto the Broomielaw / Lancefield Quay, staying on the road the whole time. I make use of the ASL in the above link and most of the time wait go through on the green light with the rest of the traffic but occasionally timing means I arrive at and go through the junction when the green man / bicycle is lit.
Now it's a toucan crossing (green man for pedestrians alongside a green bicycle for... bicycles!) and when I do this, I wait until all pedestrians have cleared the junction before slowly proceeding, not building up speed until I'm away from the crossing. My concern is that as I at no point use the cycle track, am I in the wrong to cross then?