If I was in Bethlehem in 4BC Mary and Joseph would have had a proper room!

9am - 9.30pm non stop building work.
A wall area of plaster has been ripped off, as it was more loose then attached. I will cement render it ready for plaster skimming.
All the first fix electrical has been done except for a light point and the light switch.
One wall almost fully plaster boarded, just one small sheet and a small bit to do.
The opposite wall has all the studs marked out ready for overboarding.
Most of the broken plaster cornice has been removed.
A car load of old plaster board has been taken tot he tip and 8 bags of rubble are ready to go tomorrow.
Only had half a glass of wine left so enjoying a

now.