Builds, rebuilds to modifications plans for 2021

Page may contain affiliate links. Please see terms for details.
Location
Brussels
Coming to this a bit late! Typical though, the first year I have put together in my head a list of things to do and I miss the thread to commit so it actually gets done.

Almost a third of the way through the year and I’m half way (almost) through the original list.

The SBDU is finished after much fighting with ferrules and the realisation that people will omit to mention all kinds of missing parts, cos it was not shown on the photos.

“project Greg” almost done but in need of some specialist expertise, explanation and photo later .

Both Erofication projects, (putting low enough gearing on bikes not to have to walk up as many hills) ihave all the parts assembled in cardboard boxes or on the way. The Coppi is getting a 1960’s drive train, that will take me down to 28/26. The Gios is going full “Wallclimber” with a period correct Campag (ish) 26/32

To much text, not enough photos, here is the SBDU as seen on Classic and Vintage
 

Attachments

  • 080CB261-04F9-4779-A1CB-EC5EF1DE4B0E.jpeg
    080CB261-04F9-4779-A1CB-EC5EF1DE4B0E.jpeg
    281.3 KB · Views: 4
Top Bottom