Its just been on the local news, that part of the requirment for building a new IKEA in Sheffield was the provision of a cycle track to link to existing tracks.
It seems the council made a bit of a mess of the planning and it was never built, IKEA refuse to remedy saying they complied with the planning instructions.
A bit of a cock up.
https://www.cyclesheffield.org.uk/2018/09/17/where-is-the-cycle-infrastructure-at-ikea/
It seems the council made a bit of a mess of the planning and it was never built, IKEA refuse to remedy saying they complied with the planning instructions.
A bit of a cock up.
https://www.cyclesheffield.org.uk/2018/09/17/where-is-the-cycle-infrastructure-at-ikea/