We are now out of the welsh lockdown, so I can get materials for the bathroom refurb.......
after removing shower cubicle yesterday, today it was tile and old plaster board removal
First bit of boxing in the pipwork for the toilet, sink and handbasin waste
after removing shower cubicle yesterday, today it was tile and old plaster board removal
First bit of boxing in the pipwork for the toilet, sink and handbasin waste
Last edited:


I'll be following this as I've got a downstairs loo to build and the bathroom upstairs to replace once I'm done with the structural stuff