We've measured up to fabricate some guiderails on a machine..they're here now with the engineering manager who says..
'We'll fit em now, turn that machine off Col'
'Done'
Within seconds, a line leader skips through..
'Whats going on ?'
'Two minutes, we're just fitting these rails' (two minutes, haha, more like 15..)
'Oh, ok'
Two minutes later, packing manager comes through..
'Paul, whatcha stopped the lines for ?'
'We're fitting these'
'But Paul, I need to know when you re doing stuff like this, how long are you going to be ?'
'Im telling you now then, we'll be half an hour'
Packing manager submits, we carry on, I snigger to myself..engineering manager (very much hands on type) doesnt bat an eyelid and carries on.
I like his style. They've complained long enough about the lack of rails...now they're going to have them.