Colin Grigson
Bass guitarist - Bad News
- Location
- Slovakia
A busy few days have seen me putting a mist coat on the new plaster downstairs … I used to enjoy painting the odd room but this is on a scale I’m unfamiliar with - I ache everywhere after 3 days so far … I’ve calculated I’ll need 30 x 20kg buckets of paint at the current usage - that’s a lot of paint to stick up there !
The plaster boarders have started with the first layer (180mm thick) insulation between the beams, 220mm still to go up (at 90’ to existing) in 1 x layer of 160mm and the last of 60mm at 90’ to the second layer - the idea of that being that there will be almost no joints on top of each other … first disaster today - the wall cupboard above the sink in my daughter‘s bathroom has been ordered too wide now the construction for the ceiling is in place - just been back to the bathroom people (cap in hand) to return the 1200mm one and order an 800mm in its place - I suspect there’s more of these minor issues to come before the house is finished
The plaster boarders have started with the first layer (180mm thick) insulation between the beams, 220mm still to go up (at 90’ to existing) in 1 x layer of 160mm and the last of 60mm at 90’ to the second layer - the idea of that being that there will be almost no joints on top of each other … first disaster today - the wall cupboard above the sink in my daughter‘s bathroom has been ordered too wide now the construction for the ceiling is in place - just been back to the bathroom people (cap in hand) to return the 1200mm one and order an 800mm in its place - I suspect there’s more of these minor issues to come before the house is finished

Last edited: