I've made the pipework up ready to do the connections in the airing cupboard now too 😊
The pipe going away from the photo goes up the wall and into the boiler - this is the cold supply for the hot water and the filling loop. The pipe going off to the left serves the bath, toilet and sink in the bathroom 😊 I think I might clean the debris out before I spark the blow torch up in there
Just need to sort the new hot water pipework out now - another hole to be drilled through the kitchen ceiling
The pipe going away from the photo goes up the wall and into the boiler - this is the cold supply for the hot water and the filling loop. The pipe going off to the left serves the bath, toilet and sink in the bathroom 😊 I think I might clean the debris out before I spark the blow torch up in there

Just need to sort the new hot water pipework out now - another hole to be drilled through the kitchen ceiling



Two of the base units are damaged, one of which isn't salvageable. The other is the corner unit that needs to go in first so I'll try and make do with it, it won't be visible once it's fitted and should be well away from any moisture. The unsalvageable one is the sink unit where there's a big chunk split out around a screw head, very disappointing. One length of plinth also needs replacing because the paint has rubbed off and both lengths of cornice are completely missing
The company get great reviews and I know several people that have used them without any problems so looks like we've just been unlucky but it's extremely frustrating - it'll likely delay having a working kitchen by at least another few weeks as they'll have to make the replacement units and ship them
I'm slowly working my way through them, there are a few other areas of concern but by the time I finish this project I should have tackled the majority of them