The new company car will be arriving within the next 6 weeks or so; with the arrival of the van this means the pressure is now on to finish the new driveway out front as otherwise there won't be space for it  We have the dropped kerb being done in early July so I've got to get my arse in gear again
 We have the dropped kerb being done in early July so I've got to get my arse in gear again 
Yesterday evening after work I dug a trench and filled it with concrete; once the storms have passed in the next few days I'll build a small brick raised bed here.
	
		
			
		
		
	
		
		
	
	
		 
	
	
		
			
		
		
	
I've just ordered some black slate slabs to lay the footpath and steps to the front door then I'll be able to dig out the remaining area ready to block pave Need to finalise the new drain route and lay that before the driveway goes down otherwise it'll be coming straight back up again
 Need to finalise the new drain route and lay that before the driveway goes down otherwise it'll be coming straight back up again 
	
		
			
		
		
	
			
			 We have the dropped kerb being done in early July so I've got to get my arse in gear again
 We have the dropped kerb being done in early July so I've got to get my arse in gear again 
Yesterday evening after work I dug a trench and filled it with concrete; once the storms have passed in the next few days I'll build a small brick raised bed here.
I've just ordered some black slate slabs to lay the footpath and steps to the front door then I'll be able to dig out the remaining area ready to block pave
 Need to finalise the new drain route and lay that before the driveway goes down otherwise it'll be coming straight back up again
 Need to finalise the new drain route and lay that before the driveway goes down otherwise it'll be coming straight back up again 
 
				 
 
		
 
 
		 
 
		
 
 
		 
 
		 Not much more to go, but decided it wasn't worth mixing a 1/4 load of mortar just to finish these off and I'd wait for another day when I had some more mixed for other jobs. Shouldn't take long now to lay the last few since the corner is up and it's all level.
 Not much more to go, but decided it wasn't worth mixing a 1/4 load of mortar just to finish these off and I'd wait for another day when I had some more mixed for other jobs. Shouldn't take long now to lay the last few since the corner is up and it's all level. 
 
		 
 
		 
 
		