Fine, thank you for your interest Jowwy. We’re waiting for the staircase concrete to set and then we’ve got electricians, plumbers and air-con prep moving in. Windows are due in around three weeks and garage door a couple of weeks after that - at least then the site will be secure. Once the first fix electrics, water / waste, air-con’s finished and the fireplace is built we can plaster … can’t wait for thatHows things going Grig???
. Then in early spring we’ll start the floors - damp course, thermal insulation, underfloor heating, fresh air feed for fireplace, screed and finally tiles. In the meantime external hidden blinds will be installed and the outside insulated and finished with silicon structure. Reading that back it seems endless
.
Nice airy bar area and man cave you have the grig lolFinally we have some windows - that means the plumbers can start, followed by air-con and electrics … the windows were the ‘big one’ - now we can get a move on
View attachment 629316
View attachment 629317

I wish alicat … there’s still bits and bobs to finish offThanks for the update - it looks nearly habitable!

Hahaha … not quite !. I’ll update the thread mid-week next week, it’s chaos there at the moment with the electricians chasing out anything that doesn’t move. There’s also a digger there doing a preliminary levelling before we mark out the (small) pool, therefore, outside is virtually ‘out of bounds’ and the inside is too - one good thing is that the electric Velux windows were fitted to the bathrooms earlier in the week so they’re a lot more light … seems never-ending at this stageHave you moved in yet Grigg???

Hopefully i’ll still be around to see it finished.Hahaha … not quite !. I’ll update the thread mid-week next week, it’s chaos there at the moment with the electricians chasing out anything that doesn’t move. There’s also a digger there doing a preliminary levelling before we mark out the (small) pool, therefore, outside is virtually ‘out of bounds’ and the inside is too - one good thing is that the electric Velux windows were fitted to the bathrooms earlier in the week so they’re a lot more light … seems never-ending at this stage![]()


Thank you newtsVery organised first fix, clean & tidy too![]()