Hows things going Grig???
Fine, thank you for your interest Jowwy. We’re waiting for the staircase concrete to set and then we’ve got electricians, plumbers and air-con prep moving in. Windows are due in around three weeks and garage door a couple of weeks after that - at least then the site will be secure. Once the first fix electrics, water / waste, air-con’s finished and the fireplace is built we can plaster … can’t wait for that :okay:. Then in early spring we’ll start the floors - damp course, thermal insulation, underfloor heating, fresh air feed for fireplace, screed and finally tiles. In the meantime external hidden blinds will be installed and the outside insulated and finished with silicon structure. Reading that back it seems endless :laugh:.
 
OP
OP
Colin Grigson

Colin Grigson

Bass guitarist - Bad News
Location
Slovakia
Finally we have some windows - that means the plumbers can start, followed by air-con and electrics … the windows were the ‘big one’ - now we can get a move on :okay:
629316

629317
 
OP
OP
Colin Grigson

Colin Grigson

Bass guitarist - Bad News
Location
Slovakia
Some more progress this week, plumbers have been busy preparing the wastes that will serve the bathrooms and kitchen. Next week they’ll be on hot and cold water supplies to the same. We’re having a hot water system that recirculates hot water (via pump) to within 2’ of each hot water tap, so that no matter how far the tap from the boiler we should have almost instantaneous hot water. In our current house we have time to make a pot of tea whilst the hot water travels to the tap :wacko:
631624

631625

631626

631627

631628

631629
 

jowwy

Can't spell, Can't Punctuate....Sue Me
Have you moved in yet Grigg???
 
OP
OP
Colin Grigson

Colin Grigson

Bass guitarist - Bad News
Location
Slovakia
Have you moved in yet Grigg???
Hahaha … not quite !. I’ll update the thread mid-week next week, it’s chaos there at the moment with the electricians chasing out anything that doesn’t move. There’s also a digger there doing a preliminary levelling before we mark out the (small) pool, therefore, outside is virtually ‘out of bounds’ and the inside is too - one good thing is that the electric Velux windows were fitted to the bathrooms earlier in the week so they’re a lot more light … seems never-ending at this stage :rolleyes:
 

jowwy

Can't spell, Can't Punctuate....Sue Me
Hahaha … not quite !. I’ll update the thread mid-week next week, it’s chaos there at the moment with the electricians chasing out anything that doesn’t move. There’s also a digger there doing a preliminary levelling before we mark out the (small) pool, therefore, outside is virtually ‘out of bounds’ and the inside is too - one good thing is that the electric Velux windows were fitted to the bathrooms earlier in the week so they’re a lot more light … seems never-ending at this stage :rolleyes:
Hopefully i’ll still be around to see it finished.
 
OP
OP
Colin Grigson

Colin Grigson

Bass guitarist - Bad News
Location
Slovakia
The promised update … electricians have finished cable laying, the plumbers first fix is patched ready for plaster and the air-con prep is in … we’ll patch in the electricians chases this week ready for plaster next Monday - hopefully !. We’ve also removed a load of soil in preparation for the pool and to get to a level we can start to work with for the groundwork’s that are planned - no grass - just blocks, tiles and some Astro-turf ;)